GEO-M-PACKAGE "JUST RUN"

CONCEPT

CONCEPT Compressor unit, Storage, Priority panel, Dispenser, Control cabinet as all units are allocate in a one enclosure which requires total 6.5
㎡. Compact a complete CNG refuelling station requires only to be connected with CNG pipeline and with the power cables.
■ Compact design can be installed at small area.
■ Easy to installation and friendly control system.
■ Low noise and low vibration design.
■ Low cost of total package.
INSTALLTION AND CONNECTION Suction Line 40A Pipeline Discharge Line Dispenser Hose(Dual Hoses) Vent Connection 1" Line Instrument CNG or Air Control Power 220V 50/60Hz/1phase Power Unit Separated Area Installation Anker bolts on the concrete Working Temp. -50°C to 65°C

  1. main Motor
  2. Blow-down Tanks
  3. Compressor
  4. Heat Exchanger
  1. Storage
  2. Gauge Panel
  3. Fill Panel
  4. Dispenser

PACKAGE Size : 3300mm(H) x 1600mm(W) x 3950mm(D) Weight : 4500 Kg
MAIN COMPONENTS
■ GEO-M-Compressor with Motor
■ Gas Suction Filter
■ Storage
■ Priority Fill Panel
■ Dispenser – Dual Hoses
■ Blow Down Vessel
■ Heat Exchanger
■ Control Gauge Panel and Local Switch Box
■ Gas Detector (Optional)
■ Explosion proof lighting (Optional)
■ Emergency Stop Button
■ Other options, according to customer's request